Taos Substation Expansion

This 2005 project involved the expansion of the Taos Substation to provide backup should the primary transformer fail. This project was primarily documentation due the existing substation, however several photographic simulations were prepared for the project.

Photopoint 2 - Existing Conditions

Photopoint 2 – Existing Conditions

Photopoint 2 - Photographic Simulation

Photopoint 2 – Photographic Simulation

Photopoint 8 - Existing Conditions

Photopoint 8 – Existing Conditions

Photopoint 8 - Photographic Simulation

Photopoint 8 – Photographic Simulation

Print Friendly

Comments are closed.

UA-46643486-1